Projects per year
- 1 - 50 out of 61 results
Search results
-
Finished
Flow-MER Program Services - Basin-Scale Research and Evaluation Project
THOMPSON, R., DYER, F., HIGGISSON, W., DUNCAN, P. & Moggridge, B.
22/03/24 → 30/06/24
Project: Other
-
Effective Impervious mapping of the Tuggeranong Catchment - Internship for Joseph O'Connell
DYER, F. & O'Connell, J.
4/03/24 → 31/05/24
Project: Research
-
-
Informing Blue-green algae treatment trials in Lake Burley Griffin
DYER, F., THOMPSON, R., KEFFORD, B. & UBRIHIEN, R.
5/06/23 → 30/06/24
Project: Research
-
-
State of the Waterways ACT 2023 Update
DYER, F., THOMPSON, R. & Bartlett, J.
3/03/23 → 30/06/23
Project: Research
-
ACT Water treatment solids reuse
THOMPSON, R., DYER, F. & Bartlett, J.
1/02/23 → 30/06/23
Project: Research
-
Using aerial imagery and computer learning to detect lignum on the floodplain
HIGGISSON, W., Tschierchke, A., WHITE, D. & DYER, F.
29/11/22 → 21/07/24
Project: Research
-
-
Lake Tuggeranong and catchment research
Ubrihien, R., DYER, F., THOMPSON, R. & LEMCKERT, C.
6/05/22 → 30/09/23
Project: Research
-
WEIA: Western Edge Investigation Area: Aquatic and Riparian Literature Review
DYER, F., WILD, K. & THOMPSON, R.
4/05/22 → 31/07/22
Project: Research
-
Coordination and facilitation of collaborative design process for the FLOW-MER2.0 Basin-Scale evaluation and research project.
THOMPSON, R., Moggridge, B. & DYER, F.
28/03/22 → 31/05/22
Project: Research
-
Monitoring waterbird breeding in the Lachlan River System
DYER, F., HIGGISSON, W., Brandis, K. & Bartlett, J.
20/10/21 → 28/02/23
Project: Research
-
State of the Waterways Review ACT
DYER, F., THOMPSON, R. & Bartlett, J.
17/06/21 → 28/02/22
Project: Research
-
-
Rapid assessment of priority sites where weeds threaten biodiversity across the South East Local Land Services region
DYER, F., HIGGISSON, W. & Bartlett, J.
1/03/21 → 31/07/21
Project: Research
-
-
Blue Green Algae Management in Lake Burley Griffin: Preliminary Study
6/03/20 → 30/12/20
Project: Research
-
STAGE 2 - Monitoring, Evaluation and Research Services: Basin Scale
THOMPSON, R., Pollino, C. A., DYER, F., Moggridge, B. & Poff, N. L.
1/10/19 → 30/06/22
Project: Research
-
STAGE 1 - Monitoring, Evaluation and Research Services: Basin Scale
THOMPSON, R., Pollino, C. A., DYER, F., Moggridge, B., Guarino, E. & GRUBER, B.
1/03/19 → 30/06/19
Project: Research
-
eDNA methods to monitor native fish in the Lachlan catchment during 2018-19
DYER, F., GLEESON, D., Broadhurst, B., FURLAN, E. & Thiem, J.
19/11/18 → 29/02/20
Project: Research
-
Urban Stormwater Research: Lake Tuggeranong and Urban Ponds
DYER, F., FOSTER, S., THOMPSON, R., LEMCKERT, C., Sherman, B., Lawrence, I. & Bray, J.
11/09/17 → 15/08/19
Project: Research
-
A review of the ACT's Environmental Flow Guidelines and develop revised Guidelines
Broadhurst, B., Nichols, S. & DYER, F.
19/04/17 → 31/10/17
Project: Research
-
-
Ecosystem Function Review
DYER, F., Barratt, D., Hardie, R., Stacey, M. & Winfield, D.
Alluvium Consulting Australia Pty Ltd
7/02/17 → 30/08/17
Project: Research
-
-
-
Water Quality monitoring Campbell 5 Project 2
Broadhurst, B., DYER, F., HARRISON, E. & Nichols, S.
11/11/15 → 31/12/19
Project: Other
-
Wetting and drying of an urban pond
DYER, F., Sherman, B. & THOMPSON, R.
1/09/15 → 30/09/16
Project: Other
-
-
-
Water quality monitoring-Amaroo
Broadhurst, B., DYER, F., HARRISON, E. & Nichols, S.
1/08/14 → 30/06/16
Project: Other
-
Long term Intervention monitoring project: Lachlan River system
DYER, F., Broadhurst, B., Gilligan, D. M., Jenkins, K., Kingsford, R. T., MOORE, L., Martin, F., Merrit, W., Packard, P., Saintilan, N., THOMPSON, R. & Thomas, R.
15/09/13 → 30/12/19
Project: Research
-
Changing food habits and trophic interactions in a newly filing reservoir to HDR student Sally Hatton
1/04/13 → 31/10/15
Project: Research
-
A review of Waterwatch and Catchment Health Indicator Program
DYER, F., GRUBER, B., HARRISON, E. & Nichols, S.
1/04/13 → 30/06/13
Project: Research
-
Fine sediment and macroinvertrebrate communites in Lower Cotter Catchment streams
HARRISON, E., DYER, F. & REYNOLDSON, T.
1/01/13 → 31/12/14
Project: Research
-
Face to the future: building resilient NRM Communities through targeted integrated climate impacts and adaptations research in the central slopes region-via USQ
DYER, F., Cockfield, G., GRUBER, B., HARRISON, E., KATH, J., LUCENA-MOYA, P. & Mushtaq, S.
1/01/13 → 31/12/16
Project: Research
-
The provision of water management services (technical) under a panel arrangement.
DYER, F., Briggs, S., Broadhurst, B., DOWNEY, P., GEORGES, A., GRUBER, B., HARRISON, E., LINTERMANS, M., MOORE, L., Nichols, S., Osborne, W., Osborne, W., Reynoldson, T., WHITE, D., WILLIAMS, D. & WILLIAMS, D.
17/10/12 → 31/08/16
Project: Other
-
-
Potential Impacts of the Murrumbidgee to Googong Water Transfer Scheme on Murray Cod
DYER, F. & LINTERMANS, M.
14/12/11 → 30/06/15
Project: Other
-
Predicting water quality and ecological responses to a changing climate: informing adaptation initiatives
1/10/11 → 28/03/13
Project: Other
-
Provision of Environmental Water Management Services Under a Panel Arrangement.
1/10/11 → 1/10/14
Project: Other
-
Standing Deed of Offer for 'Chemistry Evaluation of Applications for Registration of Agricultural Chemical Products'
17/08/11 → 30/06/14
Project: Other
-
Expert peer review of a blackwater assessment for the Koondrook Perricoota Forest Flood Enhancement Works (KPFFEW)
6/06/11 → 15/07/11
Project: Research
-
Water Quality Pilot Study funded by ACT Government and ACTEW
DYER, F. & NORRIS, R.
21/06/10 → 20/06/12
Project: Other
-
Research Services for ecological outcomes of the Murrumbidgee to Cotter pumping augmentation during the construction of the enlarged Cottor Dam (Phase 1)
HARRISON, E., NORRIS, R. & DYER, F.
7/06/10 → 30/09/10
Project: Other
-
Short form Services contract for the continued provision of research support services for maintenance and updating of the AUSRIVAS website
DYER, F. & NORRIS, R.
27/05/10 → 30/06/10
Project: Other
-
Provision of Lower Cotter Catchment Quality Research Services
HARRISON, E., NORRIS, R. & DYER, F.
31/03/10 → 31/03/14
Project: Other
-
Provision Research Services for Assessing Water Quality of ACT Rivers
Broadhurst, B., HARRISON, E., NORRIS, R., DYER, F. & Nichols, S.
11/03/10 → 31/08/17
Project: Other