Search concepts
|
Selected filters
|
- 1,700 - 1,750 out of 2,178 results
Search results
-
Investigation on the effects of polymicrobial infection on the induction of otitis media
KYD, J.
1/01/06 → 31/12/08
Project: Other
-
-
Provision of a comprehensive Literature Review of healthy eating and physical activity amongst women from disadvantaged groups (administered by Monash University)
Parker, R.
1/03/08 → 31/12/08
Project: Other
-
-
Prototype Decision Support System (DSS) for Environment Flows to Narran Lakes
THOMS, M.
1/11/07 → 30/11/08
Project: Other
-
Phylogentics and genetic guidelines for the captive breeding of the critically endangered snake-necked turtle Chelondina mccordi.
Alacs, E., Georges, A., Kuchling, G. & Rhodin, A. G. J.
5/11/08 → 30/11/08
Project: Other
-
-
-
Healthpact Research Centre for Health Promotion and Wellbeing ACT (Note: formally Rhian Parker was the lead CI, transfered to Diane Gibson 2008)
Gibson, D., MORRISON, P., Shaddock, T. & Shaddock, T.
21/03/05 → 31/10/08
Project: Other
-
Development of a DNA sexing method for the endangered Southern Corroboree frog (Pseudophryne corroboree)
19/10/07 → 19/10/08
Project: Other
-
Short Form Services contract for the Provision of expert advice in support of the conservation and management of Australia's marine turtles
FITZSIMMONS, N. & NORRIS, R.
6/06/08 → 16/10/08
Project: Other
-
Qualitative Analyses of Carers Australia 2020 Virtual Summit
BLOOD, W.
1/07/08 → 10/10/08
Project: Other
-
Role of floodplains: Resilience, value of ecosystem services and guidelines for diverting water from floodplains
THOMS, M.
1/03/08 → 31/08/08
Project: Other
-
Corporate Governance in the Public Sector: An Evaluation of its Tensions, Gaps and Potential
Edwards, M., Halligan, J. & Nicoll, G.
30/09/03 → 31/08/08
Project: Other
-
Attraction Satisfaction Benchmarking Project
RITCHIE, B.
CRC for Sustainable Tourism Pty Ltd
1/01/07 → 30/07/08
Project: Other
-
Biological Monitoring of Water Quality in Kosciuszko National Park NSW 2007/08
NORRIS, R.
1/07/07 → 30/06/08
Project: Other
-
Determining ecologoically meanginful water quality standards for rivers in the western catchment area
THOMS, M., Parsons, M., RAYBURG, S., REID, M. & Webb, M.
18/07/07 → 30/06/08
Project: Other
-
Overcoming resistance to the introduction of a Health Informatics System in General Practice Medicine
RICE, J.
1/07/05 → 30/06/08
Project: Other
-
Research into population densities of native predators in the Northern Territory and Western Australia before the advent of toads.
DOODY, S.
1/07/07 → 30/06/08
Project: Other
-
Water Quality Monitoring Salinity Sampling
NORRIS, R.
ACT Government - Territory and Municipal Services
4/05/07 → 30/06/08
Project: Other
-
ACT Water Quality Monitoring, Biological Assessment using AUSRIVAS macroinvertebrate protocols
NORRIS, R.
1/07/05 → 30/06/08
Project: Other
-
Member of Steering Committee for the Alignment of River and Wetland Health Assessment Needs (refer to comments)
NORRIS, R.
Department of Natural Resources and Water (Queensland)
11/01/08 → 30/06/08
Project: Other
-
Regulating Australian small corporations: an examination of optimal conditions for success
CLARKE, A. & EDDIE, I.
17/10/07 → 30/06/08
Project: Other
-
-
CSIRO Research Scholarship awarded to MsTina Micevska, Health Design and Science
MAHER, B.
5/01/05 → 30/06/08
Project: Other
-
Establishing benchmarks and trajectories of change in inland wetland ecosystems
THOMS, M., Parsons, M., RAYBURG, S., REID, M., Thorp, J. & Webb, M.
11/07/07 → 30/06/08
Project: Other
-
Floodplain Vegetation Health in the Western CMA
THOMS, M., Delong, M., Parsons, M., RAYBURG, S., REID, M., Thorp, J. & Webb, M.
11/07/07 → 30/06/08
Project: Other
-
-
Wetland ecological description for the lower Lachlan floodplain (downstream of Corrong)
REID, M., Butcher, R., Capon, S., PARSONS, M. & THOMS, M.
13/02/08 → 31/05/08
Project: Other
-
-
Estimating the burden of disease associated with respiratory syncytial virus in Australia
BROWN, L., LIDBURY, B. & RANMUTHUGALA, G.
8/12/07 → 30/04/08
Project: Other
-
Preparation and implementation of a management plan for the upper Molonglo River Green and Gold Bell Frog Population
OSBORNE, W.
26/06/07 → 30/04/08
Project: Other
-
Improving the marketing system for maize and soybeans in Cambodia
FITZGERALD, R., SPRIGGS, J., SPRIGGS, J., CHAMBERS, B. & CHAMBERS, B.
Australian Centre for International Agricultural Research
1/07/04 → 30/04/08
Project: Other
-
-
Wildlife Forensics: Tracking Wildlife Seizures back to Source
Georges, A., Alacs, E. A., FITZSIMMONS, N. & FITZSIMMONS, N.
27/04/07 → 27/04/08
Project: Other
-
Sustainable Rivers Audit Independent Consultant (ref MD636) Vegetation Theme Coordinator consultancy
REID, M.
Murray Darling Basin Commission
1/03/07 → 25/04/08
Project: Other
-
Future Directions for Alternative Education Provisions in the ACT Public School System
WATSON, L.
Department of Disability, Housing and Community Services
31/12/07 → 11/04/08
Project: Other
-
Re-conceptualising Tertiary Science Education for the 21st Century
THOMAS, S.
Australian Learning and Teaching Council
30/11/06 → 31/03/08
Project: Other
-
Cooperative explorations: a multiple strategy literacy intervention program
KILHAM, C.
24/08/06 → 31/03/08
Project: Other
-
Assessing the Narran Lakes Hydrology and Waterbird Models (Agreement for the Provision of Services for Commission Project)
THOMS, M.
Murray Darling Basin Commission
1/02/08 → 30/03/08
Project: Other
-
Develop and pilot test a method of determining the distribution of reference river -types within the MDB, and the reference geomorphic character of the river types at the reach scale
RAYBURG, S., Parsons, M. & THOMS, M.
6/06/07 → 28/02/08
Project: Other
-
Assessing Group Work in Media and Communications
Alderman, B., Battye, G. & Webb, J.
17/10/05 → 28/02/08
Project: Other
-
Careers Australia: Qualitative Research and the Career Health and Wellbeing Index
BLOOD, W.
4/02/08 → 18/02/08
Project: Other
-
Develop, pilot test and implement across the entire Murray-Darling Basin, a reach-scale river type 'taxonomy' system that is inclusive of floodplains
THOMS, M. & RAYBURG, S.
28/08/06 → 15/02/08
Project: Other
-
-
-
Australian Competitive Grant Encouragement Awarded application for near miss of 2006 NHMRC Project Grant 454000 Investigating the mechanisms of viral-induced Arthritis/Arthralgia
MAHALINGAM, S.
17/01/07 → 17/01/08
Project: Other