BIM applications toward key performance indicators of construction projects in Iran

Moslem Sheikhkhoshkar, Saeed BANIHASHEMI

Research output: Contribution to journalArticle

Abstract

Building Information Modeling (BIM) has recently emerged as a novel technology worldwide however literature review reveals a salient gap in the identification of BIM capabilities in Key Performance Indicators (KPI) of construction projects in Iran. Therefore, the aim of this research is to identify and prioritize the BIM applications toward KPIs in light of the construction stage of projects life cycle in Iran. To do this, a review of literature was performed on the KPIs and associated BIM contributions and the resultants were customized for Iranian context through a two-round Delphi study. An advanced Fuzzy-AHP approach was then applied in the prioritizations of KPIs and associated BIM capabilities via collecting data from construction practitioners. It was identified that quality improvement, sustainable construction and construction cost reduction are the top three KPIs that can be benefitted from BIM applications in the construction stage of building projects. It was also concluded that project coordination, clash detection, 4D and 5D BIM are the subsequent beneficial effects of BIM on the construction project KPIs in Iran. This study is a point of departure for BIM-based research and its managerial perspectives outlining an insight toward the application of BIM in the construction projects of Iran.
LanguageEnglish
Pages1-17
Number of pages17
JournalInternational Journal of Construction Management
DOIs
StatePublished - 24 Sep 2018

Fingerprint

Construction project
Information modeling
Iran
Key performance indicators
Cost reduction
Life cycle
Sustainable construction
Fuzzy AHP
Construction costs
Project life cycle
Prioritization
Literature review
Quality improvement
Delphi study

Cite this

@article{b83fe29921024770bb336ea05ba252d2,
title = "BIM applications toward key performance indicators of construction projects in Iran",
abstract = "Building Information Modeling (BIM) has recently emerged as a novel technology worldwide however literature review reveals a salient gap in the identification of BIM capabilities in Key Performance Indicators (KPI) of construction projects in Iran. Therefore, the aim of this research is to identify and prioritize the BIM applications toward KPIs in light of the construction stage of projects life cycle in Iran. To do this, a review of literature was performed on the KPIs and associated BIM contributions and the resultants were customized for Iranian context through a two-round Delphi study. An advanced Fuzzy-AHP approach was then applied in the prioritizations of KPIs and associated BIM capabilities via collecting data from construction practitioners. It was identified that quality improvement, sustainable construction and construction cost reduction are the top three KPIs that can be benefitted from BIM applications in the construction stage of building projects. It was also concluded that project coordination, clash detection, 4D and 5D BIM are the subsequent beneficial effects of BIM on the construction project KPIs in Iran. This study is a point of departure for BIM-based research and its managerial perspectives outlining an insight toward the application of BIM in the construction projects of Iran.",
author = "Moslem Sheikhkhoshkar and Saeed BANIHASHEMI",
year = "2018",
month = "9",
day = "24",
doi = "10.1080/15623599.2018.1484852",
language = "English",
pages = "1--17",
journal = "International Journal of Construction Management",
issn = "1562-3599",
publisher = "Taylor and Francis Ltd.",

}

BIM applications toward key performance indicators of construction projects in Iran. / Sheikhkhoshkar, Moslem; BANIHASHEMI, Saeed.

In: International Journal of Construction Management, 24.09.2018, p. 1-17.

Research output: Contribution to journalArticle

TY - JOUR

T1 - BIM applications toward key performance indicators of construction projects in Iran

AU - Sheikhkhoshkar,Moslem

AU - BANIHASHEMI,Saeed

PY - 2018/9/24

Y1 - 2018/9/24

N2 - Building Information Modeling (BIM) has recently emerged as a novel technology worldwide however literature review reveals a salient gap in the identification of BIM capabilities in Key Performance Indicators (KPI) of construction projects in Iran. Therefore, the aim of this research is to identify and prioritize the BIM applications toward KPIs in light of the construction stage of projects life cycle in Iran. To do this, a review of literature was performed on the KPIs and associated BIM contributions and the resultants were customized for Iranian context through a two-round Delphi study. An advanced Fuzzy-AHP approach was then applied in the prioritizations of KPIs and associated BIM capabilities via collecting data from construction practitioners. It was identified that quality improvement, sustainable construction and construction cost reduction are the top three KPIs that can be benefitted from BIM applications in the construction stage of building projects. It was also concluded that project coordination, clash detection, 4D and 5D BIM are the subsequent beneficial effects of BIM on the construction project KPIs in Iran. This study is a point of departure for BIM-based research and its managerial perspectives outlining an insight toward the application of BIM in the construction projects of Iran.

AB - Building Information Modeling (BIM) has recently emerged as a novel technology worldwide however literature review reveals a salient gap in the identification of BIM capabilities in Key Performance Indicators (KPI) of construction projects in Iran. Therefore, the aim of this research is to identify and prioritize the BIM applications toward KPIs in light of the construction stage of projects life cycle in Iran. To do this, a review of literature was performed on the KPIs and associated BIM contributions and the resultants were customized for Iranian context through a two-round Delphi study. An advanced Fuzzy-AHP approach was then applied in the prioritizations of KPIs and associated BIM capabilities via collecting data from construction practitioners. It was identified that quality improvement, sustainable construction and construction cost reduction are the top three KPIs that can be benefitted from BIM applications in the construction stage of building projects. It was also concluded that project coordination, clash detection, 4D and 5D BIM are the subsequent beneficial effects of BIM on the construction project KPIs in Iran. This study is a point of departure for BIM-based research and its managerial perspectives outlining an insight toward the application of BIM in the construction projects of Iran.

U2 - 10.1080/15623599.2018.1484852

DO - 10.1080/15623599.2018.1484852

M3 - Article

SP - 1

EP - 17

JO - International Journal of Construction Management

T2 - International Journal of Construction Management

JF - International Journal of Construction Management

SN - 1562-3599

ER -