Skip to main navigation Skip to search Skip to main content

BIM applications toward key performance indicators of construction projects in Iran

  • Moslem Sheikhkhoshkar
  • , Saeed BANIHASHEMI

    Research output: Contribution to journalArticlepeer-review

    Abstract

    Building Information Modeling (BIM) has recently emerged as a novel technology worldwide however literature review reveals a salient gap in the identification of BIM capabilities in Key Performance Indicators (KPI) of construction projects in Iran. Therefore, the aim of this research is to identify and prioritize the BIM applications toward KPIs in light of the construction stage of projects life cycle in Iran. To do this, a review of literature was performed on the KPIs and associated BIM contributions and the resultants were customized for Iranian context through a two-round Delphi study. An advanced Fuzzy-AHP approach was then applied in the prioritizations of KPIs and associated BIM capabilities via collecting data from construction practitioners. It was identified that quality improvement, sustainable construction and construction cost reduction are the top three KPIs that can be benefitted from BIM applications in the construction stage of building projects. It was also concluded that project coordination, clash detection, 4D and 5D BIM are the subsequent beneficial effects of BIM on the construction project KPIs in Iran. This study is a point of departure for BIM-based research and its managerial perspectives outlining an insight toward the application of BIM in the construction projects of Iran.
    Original languageEnglish
    Pages (from-to)305-320
    Number of pages16
    JournalInternational Journal of Construction Management
    Volume20
    Issue number4
    DOIs
    Publication statusPublished - 3 Jul 2020

    Fingerprint

    Dive into the research topics of 'BIM applications toward key performance indicators of construction projects in Iran'. Together they form a unique fingerprint.

    Cite this