TY - JOUR
T1 - Constrained project scheduling problem
T2 - A survey of recent investigations
AU - Abdel-Basset, Mohamed
AU - Atef, Asmaa
AU - Zaied, Abd El Nasser H.
N1 - Publisher Copyright:
Copyright © 2020 Inderscience Enterprises Ltd.
PY - 2020
Y1 - 2020
N2 - Scheduling projects are very important topic in project management science. Constrained resources project scheduling problem CRPSP is a problem of the purpose of allocating the available resources to specific tasks or activities for achieving specific objectives or purposes such as minimising the makespan or time of the projects, minimising the execution cost of the project, or any other specific objective or more than one objective at the same time (multi-objectives resource constrained project scheduling problems). This paper introduces a survey for procedure scenarios, techniques, and models that are considered the main context history of CRPSP and multi-mode constrained resource project scheduling problems MMCRPSP. It aims to exhibits, highlights, and update the recent CRPSP surveys. The current state of art for recent researches is evaluated and the potential research directions and orientations are pointed. Also a new framework is proposed for the researchers of interest for this domain of research.
AB - Scheduling projects are very important topic in project management science. Constrained resources project scheduling problem CRPSP is a problem of the purpose of allocating the available resources to specific tasks or activities for achieving specific objectives or purposes such as minimising the makespan or time of the projects, minimising the execution cost of the project, or any other specific objective or more than one objective at the same time (multi-objectives resource constrained project scheduling problems). This paper introduces a survey for procedure scenarios, techniques, and models that are considered the main context history of CRPSP and multi-mode constrained resource project scheduling problems MMCRPSP. It aims to exhibits, highlights, and update the recent CRPSP surveys. The current state of art for recent researches is evaluated and the potential research directions and orientations are pointed. Also a new framework is proposed for the researchers of interest for this domain of research.
KW - Constrained resources project scheduling problem
KW - Exact methods
KW - Heuristic methods
KW - Meta-heuristic methods
KW - Multi-mode constrained resource projects
UR - http://www.scopus.com/inward/record.url?scp=85092045289&partnerID=8YFLogxK
U2 - 10.1504/IJOR.2020.108837
DO - 10.1504/IJOR.2020.108837
M3 - Short Survey/Scientific Report
AN - SCOPUS:85092045289
SN - 1745-7645
VL - 39
SP - 116
EP - 143
JO - International Journal of Operational Research
JF - International Journal of Operational Research
IS - 1
ER -