Skip to main navigation
Skip to search
Skip to main content
University of Canberra Research Portal Home
Home
Profiles
Research output
Projects
Press/Media
Activities
Research units
Prizes
Student theses
Search by expertise, name or affiliation
Frankston [Re]United: A new train station for Frankston
Iain Maxwell
, Dave Pigram
Design & Built Environment
Research output
:
Non-textual form
›
Artefact
Overview
Fingerprint
Fingerprint
Dive into the research topics of 'Frankston [Re]United: A new train station for Frankston'. Together they form a unique fingerprint.
Sort by
Weight
Alphabetically
Keyphrases
Train Station
100%
Station Design
66%
Australia
33%
High Efficiency
33%
Public Space
33%
Industry 4.0 (I4.0)
33%
Public Domain
33%
Pedestrian
33%
Sustainable Design
33%
Further Development
33%
New Industry
33%
International Competition
33%
Bespoke
33%
Sunshade
33%
Public Transport
33%
Feedback Loop
33%
Sustainable Construction
33%
Precinct
33%
Publicness
33%
Transport Projects
33%
Industry-based
33%
Atelier
33%
Urban Voids
33%
Functional Spaces
33%
Architectural Works
33%
Form-finding
33%
File-to-factory
33%
Construction Method
33%
Manufacturing Paradigm
33%
Solar Hot Water
33%
Environmental Comfort
33%
Advanced Manufacturing
33%
Robust Cost
33%
Complex Forms
33%
Computational Form-finding
33%
Rainwater Collection
33%
CNC Process
33%
Industry Benchmark
33%
Roof Design
33%
Variable Refrigerant Flow
33%
Rooftop Photovoltaic
33%
Solar Gains
33%
Urban Corridor
33%
Flow Unit
33%
Rooftop Solar
33%
Station Building
33%
Building Features
33%
Carbon Negative
33%
Cooling Duct
33%
Timber Roof
33%
Negative Constructions
33%
Infrastructure Sustainability
33%
Consulting Engineer
33%
Railway Infrastructure
33%
Smart Manufacturing
33%
Framework Fabrication
33%
Long-term Reclamation
33%
Project Location
33%
Catalytic Steps
33%
New Stations
33%
Engineering
Form Finding
100%
Station Design
100%
Australia
50%
Directional
50%
Ecodesign
50%
Realization
50%
Feedback Loop
50%
Construction Method
50%
Photovoltaics
50%
Rail Infrastructure
50%
Smart Manufacturing
50%
Rainwater
50%
Consulting Engineer
50%
Manufacturing Paradigm
50%
Duct
50%
Solar Gain
50%
Hot Water
50%
Earth and Planetary Sciences
Australia
100%
Environmental Impact Assessment
100%
Shading
100%
Hot Water
100%
Construction Method
100%
Rain Water
100%