T1 - From Design to Operations
T2 - A Process Management Life-Cycle Performance Measurement System for Public-Private Partnerships
AU - Liu, Henry
AU - Love, Peter
AU - Smith, Jim
AU - Irani, Zahir
AU - Hajli, Nick
AU - Sing, Michael
N1 - Publisher Copyright:
© 2017 Informa UK Limited, trading as Taylor & Francis Group.
PY - 2018
Y1 - 2018
N2 - Public–Private Partnerships (PPPs) have become a critical vehicle for delivering infrastructure worldwide. Yet, the use of such a procurement strategy has received considerable criticism, as they have been prone to experiencing time/cost overruns and during their operation poorly managed. A key issue contributing to the poor performance of PPPs is the paucity of an effective and comprehensive performance measurement system. There has been a tendency for the performance of PPPs to be measured based on their ex-post criteria of time, cost and quality. Such criteria do not accommodate the complexities and lifecycle of an asset. In addressing this problem, the methodology of sequential triangulation is used to develop and examine the effectiveness of a ‘Process Management Life Cycle Performance Measurement System’. The research provides public authorities and private-sector entities embarking on PPPs with a robust mechanism to effectively measure, control and manage their projects’ life cycle performances, ensuring the assets are ‘future proofed’.
AB - Public–Private Partnerships (PPPs) have become a critical vehicle for delivering infrastructure worldwide. Yet, the use of such a procurement strategy has received considerable criticism, as they have been prone to experiencing time/cost overruns and during their operation poorly managed. A key issue contributing to the poor performance of PPPs is the paucity of an effective and comprehensive performance measurement system. There has been a tendency for the performance of PPPs to be measured based on their ex-post criteria of time, cost and quality. Such criteria do not accommodate the complexities and lifecycle of an asset. In addressing this problem, the methodology of sequential triangulation is used to develop and examine the effectiveness of a ‘Process Management Life Cycle Performance Measurement System’. The research provides public authorities and private-sector entities embarking on PPPs with a robust mechanism to effectively measure, control and manage their projects’ life cycle performances, ensuring the assets are ‘future proofed’.
KW - Australia
KW - PPPs
KW - future proofing
KW - infrastructure asset
KW - performance measurement
UR - http://www.scopus.com/inward/record.url?scp=85030534746&partnerID=8YFLogxK
UR - https://www.mendeley.com/catalogue/5a37f383-9eea-3577-92c1-39cf83b39aee/
U2 - 10.1080/09537287.2017.1382740
DO - 10.1080/09537287.2017.1382740
M3 - Article
SN - 0953-7287
VL - 29
SP - 68
EP - 83
JO - Production Planning and Control
JF - Production Planning and Control
IS - 1
ER -