Prioritization of Industrialized Building System Components for BIM Applications

Saeed BANIHASHEMI, Mahmoud Shakouri, Yousef Vahed, Mahdi Meynagh

Research output: A Conference proceeding or a Chapter in BookConference contribution

Abstract

At the present time, construction industry is lacking information concerning predefined IBS geometrics and components which can be used in BIM. The aim of this study is to prioritize industrialized building system’s components with reference to BIM principals in order to be integrated with BIM software packages. The Warszawski classification which is based on geometrical configurations, was selected as the target classification to be prioritized by using analytical hierarchy process. The results show that the most important categories to be integrated with BIM are “Planar or Panel System”, “Linear or Skeleton System”, “Box System” and “Industrialization on Site” respectively. The results of this paper can be used to develop some specific algorithms and frameworks for BIM to facilitate the process of design calibration and production of IBS components
Original languageEnglish
Title of host publicationProceedings of 2012 International Conference on Construction and Project Management
EditorsProf. Yixun Shi
Place of PublicationDubai
PublisherAmerican Society of Civil Engineers
Pages128-132
Number of pages5
ISBN (Print)9789810730093
Publication statusPublished - 2012
Externally publishedYes
EventICCPM 2012 - Dubai, Dubai, United Arab Emirates
Duration: 4 Aug 20125 Aug 2012

Conference

ConferenceICCPM 2012
CountryUnited Arab Emirates
CityDubai
Period4/08/125/08/12

Fingerprint

Construction industry
Software packages
Calibration

Cite this

BANIHASHEMI, S., Shakouri, M., Vahed, Y., & Meynagh, M. (2012). Prioritization of Industrialized Building System Components for BIM Applications. In P. Y. Shi (Ed.), Proceedings of 2012 International Conference on Construction and Project Management (pp. 128-132). Dubai: American Society of Civil Engineers.
BANIHASHEMI, Saeed ; Shakouri, Mahmoud ; Vahed, Yousef ; Meynagh, Mahdi. / Prioritization of Industrialized Building System Components for BIM Applications. Proceedings of 2012 International Conference on Construction and Project Management. editor / Prof. Yixun Shi. Dubai : American Society of Civil Engineers, 2012. pp. 128-132
@inproceedings{d4fb1a1b75bf4cf69b8b1f8eb847fcd9,
title = "Prioritization of Industrialized Building System Components for BIM Applications",
abstract = "At the present time, construction industry is lacking information concerning predefined IBS geometrics and components which can be used in BIM. The aim of this study is to prioritize industrialized building system’s components with reference to BIM principals in order to be integrated with BIM software packages. The Warszawski classification which is based on geometrical configurations, was selected as the target classification to be prioritized by using analytical hierarchy process. The results show that the most important categories to be integrated with BIM are “Planar or Panel System”, “Linear or Skeleton System”, “Box System” and “Industrialization on Site” respectively. The results of this paper can be used to develop some specific algorithms and frameworks for BIM to facilitate the process of design calibration and production of IBS components",
keywords = "BIM, industrialized building system, prefabrication, object oriented model, AHP",
author = "Saeed BANIHASHEMI and Mahmoud Shakouri and Yousef Vahed and Mahdi Meynagh",
year = "2012",
language = "English",
isbn = "9789810730093",
pages = "128--132",
editor = "Shi, {Prof. Yixun}",
booktitle = "Proceedings of 2012 International Conference on Construction and Project Management",
publisher = "American Society of Civil Engineers",

}

BANIHASHEMI, S, Shakouri, M, Vahed, Y & Meynagh, M 2012, Prioritization of Industrialized Building System Components for BIM Applications. in PY Shi (ed.), Proceedings of 2012 International Conference on Construction and Project Management. American Society of Civil Engineers, Dubai, pp. 128-132, ICCPM 2012, Dubai, United Arab Emirates, 4/08/12.

Prioritization of Industrialized Building System Components for BIM Applications. / BANIHASHEMI, Saeed; Shakouri, Mahmoud; Vahed, Yousef; Meynagh, Mahdi.

Proceedings of 2012 International Conference on Construction and Project Management. ed. / Prof. Yixun Shi. Dubai : American Society of Civil Engineers, 2012. p. 128-132.

Research output: A Conference proceeding or a Chapter in BookConference contribution

TY - GEN

T1 - Prioritization of Industrialized Building System Components for BIM Applications

AU - BANIHASHEMI, Saeed

AU - Shakouri, Mahmoud

AU - Vahed, Yousef

AU - Meynagh, Mahdi

PY - 2012

Y1 - 2012

N2 - At the present time, construction industry is lacking information concerning predefined IBS geometrics and components which can be used in BIM. The aim of this study is to prioritize industrialized building system’s components with reference to BIM principals in order to be integrated with BIM software packages. The Warszawski classification which is based on geometrical configurations, was selected as the target classification to be prioritized by using analytical hierarchy process. The results show that the most important categories to be integrated with BIM are “Planar or Panel System”, “Linear or Skeleton System”, “Box System” and “Industrialization on Site” respectively. The results of this paper can be used to develop some specific algorithms and frameworks for BIM to facilitate the process of design calibration and production of IBS components

AB - At the present time, construction industry is lacking information concerning predefined IBS geometrics and components which can be used in BIM. The aim of this study is to prioritize industrialized building system’s components with reference to BIM principals in order to be integrated with BIM software packages. The Warszawski classification which is based on geometrical configurations, was selected as the target classification to be prioritized by using analytical hierarchy process. The results show that the most important categories to be integrated with BIM are “Planar or Panel System”, “Linear or Skeleton System”, “Box System” and “Industrialization on Site” respectively. The results of this paper can be used to develop some specific algorithms and frameworks for BIM to facilitate the process of design calibration and production of IBS components

KW - BIM

KW - industrialized building system

KW - prefabrication

KW - object oriented model

KW - AHP

M3 - Conference contribution

SN - 9789810730093

SP - 128

EP - 132

BT - Proceedings of 2012 International Conference on Construction and Project Management

A2 - Shi, Prof. Yixun

PB - American Society of Civil Engineers

CY - Dubai

ER -

BANIHASHEMI S, Shakouri M, Vahed Y, Meynagh M. Prioritization of Industrialized Building System Components for BIM Applications. In Shi PY, editor, Proceedings of 2012 International Conference on Construction and Project Management. Dubai: American Society of Civil Engineers. 2012. p. 128-132